Romtec concession buildings are diverse structures that make great additions to any recreation facility. You’re building can be configured with a ticket window, food preparation space, office space, extra storage, and more. Romtec designs and supplies concession buildings to meet any needs that will function perfectly and look great at your site. Make sure you get the industry’s best in site-build structures by working with Romtec.
Concession Stand FAQs
Click on the Questions below to view the Answers.
Romtec Concession Restrooms are all designed in-house to meet the exact needs of each project in all 50 states. Our Concession Restrooms are designed as site-built, permanent buildings, and are not prefabricated or modular units.
Yes, Romtec can design site-built concrete block buildings to withstand severe weather and act as storm shelters. In a concession building a safe room can be added for protection in severe weather events without having to upgrade the entire building.
Yes, several of Romtec’s Concession Restroom models have dedicated storage rooms Romtec can modify standard models to add more rooms to your building if required. One popular addition to new concession buildings is an IT room for free public Wi-Fi and communications equipment.
Yes, Romtec is a design-build firm that specializes in developing affordable custom designs to meet all types of project requirements. We have helped thousands of projects get the features they need on their concession restrooms. Each Romtec Concession Restroom is drawn in AutoCAD, submitted for your approval, and submitted for approval from the local building department.
Yes, Romtec helps our customers develop bid specifications that can integrate with their bid documents. Using Romtec during the specification process helps ensure that your project gets a Romtec Concession Restroom quoted during the bid process and ultimately approved and constructed.
One of Romtec’s specialties is in value-engineering current concession restroom building designs that are over budget. Romtec can take your existing drawings and reconfigure them to meet your budget and keep your project on schedule.
Most Romtec concession restrooms can be constructed in 6 to 8 weeks. Your construction timeline may vary between using a low-bid contractor or Romtec’s construction services, as well as the scope of work required onsite. On turnkey projects, Romtec will give you an accurate schedule for the delivery and construction of your concession restroom.
Romtec can include additional security features to your Concession Restroom like kick proof doors, metal security gates, security doors, and many other options. Romtec has supplied locking mechanisms that work on timers and even through remote systems. Even door locks can have a substantial impact on the security of your building.