Skip to content

Prairie Point Park – Oswego, IL

Romtec is a leading supplier of park restroom structures nationwide and supplied a new multi-user restroom for the Oswegoland Park District at Prairie Point Community Park in Oswego, Illinois.

Bordered by residential neighborhoods and an elementary school, Prairie Point Park serves a wide variety of guests every day. The Park features numerous sports areas including 18 acres of sports fields for soccer and football, 2 full basketball courts, 4 lighted baseball diamonds, a skatepark, and sand volleyball courts. For guests with other interests, a walking path leads along the shore of a natural wetland area, picnic areas are available, and a volunteer pantry garden helps to produce food for needy families. (“Prairie Point Community Park”, 2021)

Project Gallery

Public Restroom at Picnic Zone

While the park has features for a variety of guests to enjoy, it desperately needed an additional restroom facility. Portable toilets had been placed at the park seasonally to supplement the old existing restroom, but a more permanent solution was needed, and Romtec was able to supply a structure that fits the needs of both the park guests and the district.

The Romtec restroom has Men’s and Women’s multi-user facilities, a mechanical room, and a large storage room. Two doors on the face of the building lead into the restrooms, and a double door on the side gives access to the storage room. Inside the storage room, staff can access the entrance to the mechanical room, which runs between the restrooms.

The structure is composed of split-face block in a Cedar color with “Harbor Blue” shingle roofing. On the exterior of the structure, between the restroom entrances, guests can utilize a dual water fountain with a bottle filler for safe drinking water on the go. Gable vents on the front and rear of the structure provide ventilation in the restrooms, with a fine wire mesh that keeps large pests out. In addition to natural ventilation, the restrooms also receive natural lighting through skylights in the roof.

Inside the structure, the walls are finished with white semi-gloss tile, and deep blue bathroom partitions continue the blue theme while providing privacy when using the restroom. The fixtures (toilets, urinals, and sinks) are wall mounted, and the sinks feature motion activated faucets for easy hand washing.

For security and peace of mind, the Oswegoland Parks District elected to install magnetic locks and an in-wall timer to control the hours that the restroom can be accessed by the public. For urban areas, securing a restroom building at night can prevent vandalism, crime, and drug abuse in the restrooms.

Romtec worked with the Oswegoland Parks District, as well as Engineering Enterprises Inc. (Engineer), and Wilkinson Excavating (Contractor) for the supply of this building package. Wilkinson Excavating is local to North Central Illinois, and is a family owned and operated company who specializes in excavation and installing site utilities.

Prairie Point Community Park. Oswegoland Park District. (2021). Retrieved 21 June 2021, from https://www.oswegolandparkdistrict.org/parks/prairie-point-community-park/.

Don’t Just Take Our Word For It!

Thank you, Romtec team, the project came out wonderfully!

Department of Conservation and Natural Resources
Rating: 5

We were really impressed with the crew who came and constructed the pavilion, and the finished product is exactly as we envisioned. Thank you for helping us achieve this vision.

Fall River Valley
Rating: 5

Everyone is happy with the new restrooms. Thanks for all the hard work!

City of Irvine
Rating: 5

The end product is beautiful.

City of Reedley
Rating: 5

Thank you for everything and if/when there are jobs where we need something like this, Romtec will be at the top of the list!

Rock-N-Road Construction Inc
Rating: 5

We had an awesome experience with Romtec and were very pleased (especially) about the communication that was given to us. The project went by very smoothly and we are now off to our next adventures. The finished product was everything and more that was promised by Romtec.

Rock-N-Road Construction Inc
Rating: 5

We are very happy with how they are turning out. We have received positive feedback from the community.

City of Miamisburg Parks and Recreation
Rating: 5

That Memorial Park Project is one of our favorites too – it truly made a positive impact for our visitors, and we will continue to keep Romtec in mind as opportunities to collaborate come up!

San Mateo County
Rating: 5

I have to mention that aside from the products Romtec supplies and the workmanship of the subcontractors (Ken and crew), I’m also very impressed with your responsiveness to issues – you’re a far cry from the usual taillight warranty.

San Mateo County
Rating: 5

I am very happy with the product and the customer care. Thank you all for going the extra mile to make your products even better.

City of Rockaway Beach
Rating: 5

You get what you pay for. Romtec provided the most perfect, seamless, flawless project I could have imagined. I would use Romtec 100 times over and will not consider any other options moving forward. You were able to beat my original budget and expectations. Everyone involved was great from sales to construction management, to the construction team themselves.

City of Coos Bay
Rating: 5

I was actually out today looking at the baseball park and your building is absolutely awesome.  Our buddy and all star baseball families are going to love it!

Rockford Park District
Rating: 5

We were very impressed with Romtec on this project. The entire team was professional, forward thinking, wiling to collaborate and compromise, and the structure turned out beautiful. We definitely got what we paid for (and then some!).

Chico Area Recreation and Park District
Rating: 5

Ken Perry’s crew who installed it did a fantastic job, very organized and professional, and efficient install.

Poppy Holding, Inc.
Rating: 5

If I were to do this again, I would no doubt hire Romtec and its subcontractors to do the installation. Hindsight is always 20/20 and I learned a valuable lesson that I will hire Romtec’s certified installers to do the construction.

City of Spearfish
Rating: 5

I would be remiss if I didn’t mention Dan Keagy (Romtec’s assistant construction manager). He in my opinion went above and beyond to solve our problems and problems that were not necessarily his or Romtec’s to solve. He is a great guy and great resource for Romtec. Overall, the biggest thing to me was the service after the sale. Romtec didn’t just make the sale and move on, but they supported us through a very long and arduous construction process.

City of Spearfish
Rating: 5

Romtec was phenomenal when it came to service after the sale. They were available anytime there were questions. In addition, there were some issues with missing materials. Even though it was not Romtec’s fault for the missing materials, the were more than willing to send us the missing materials to get the project done. Romtec even sent out a representative to tour the site to give firsthand recommendations on how to proceed.

City of Spearfish
Rating: 5
Logo For Romtec

Tell Us About Your Project!

Lets get your project moving forward! Tell us about your project and our team will get to work on a personalized solution than meets your needs.

Back To Top