Skip to content

Boise, Idaho – Skatepark Sidewalk Restroom

A new skatepark sidewalk restroom can make a significant difference in a busy public recreation area. At Rhodes Park in Boise, Idaho, the city upgraded its facilities by installing a new single-use restroom that supports the park’s high daily visitor traffic. The building includes a single-occupancy restroom and features a graffiti-style exterior design that reflects the unique culture and character of the skatepark. This new skatepark restroom building provides visitors with a convenient public amenity while also complementing the park’s vibrant atmosphere.

Project Gallery

skatepark sidewalk restroom

Rhodes Park and the City of Boise

Rhodes Park is located along the Boise River and is one of the most active recreation areas in the entire city. The park is well-known for its large skatepark and riverfront pathways. Boise Parks and Recreation continue to invest into infrastructure improvements that support both everyday activities and special events, including upgrades to its restrooms, walkways, and park amenities.The new skatepark sidewalk restroom is a small part of the city’s ongoing effort to maintain reliable facilities in high-use areas, and to ensure that park visitors have access to clean public restrooms. The park plays an extremely important role in Boise’s broader riverfront network, connecting to nearby neighborhoods and the downtown core. As the city continues to grow, maintaining reliable facilities in high-use areas has become a huge priority, especially in parks that attract a wide range of visitors. The new skatepark sidewalk restroom supports this effort by providing an accessible facility that fits the character and daily activity of the site.

Project Overview: Replacing an Aging Restroom

The goal of the Rhodes Park project was to completely replace an older restroom with a new skatepark single-use restroom that meets current accessibility standards. The city specified that they wanted a single-user restroom building suited for high-traffic areas. The project was awarded to EKC, Inc., who served as the installation contractor. The updated restroom provides park visitors with a dependable, accessible facility that can keep up with the heavy use of the skatepark.

Restroom Design and Architectural Details

The building is a single-user, unisex restroom designed for regular daily use. It includes a durable concrete structure, a secure mechanical space, and interior fixtures designed to perform well long-term. The exterior of the building features a graffiti-style design that reflects the skatepark environment and helps the building to fit and add to the surrounding setting. Inside, the restroom includes standard finishes and an upgraded light lens. Temper-resistant hardware was incorporated into the design to support maintenance and keep the restroom secure. The compact layout provides a simple, yet practical restroom option for all visitors to the park.

Project Coordination and Schedule

The project closely followed a schedule outlined in the city’s bid documents, which included time for getting necessary permits and construction. Once the contract was awarded, everything was reviewed and approved and notice to proceed with the project was given shortly afterwards. The restroom package was prepared for delivery after permitting, and site preparations were in place. Coordination between the City of Boise, EKC, and Romtec helped to ensure that the building was smoothly delivered once the site was ready to receive it.

Project Partners

This project was completed in collaboration with the City of Boise Parks and Recreation as the project owner, with EKC, Inc. serving as the general contractor and installer. The City of Boise Parks and Recreation also reviewed submittals, while the Boise Building Department handled review of the permits. Both the City of Boise and EKC have worked together with Romtec on previous restroom projects and are familiar with the process of working with Romtec.

Benefits of a Skatepark Sidewalk Restroom

  • Provides a dependable restroom option in a high-use, busy recreational area
  • Offers a convenient stop for visitors in between skating sessions and other activities at the park
  • Features a graffiti-style exterior that fits the character of the skatepark and adds a unique pop of color
  • Improves accessibility and usability compared to the previous, older restroom
  • Supports daily park operations with a low-maintenance structure

Conclusion

The new skatepark sidewalk restroom located at Rhodes Park helps to support one of Boise’s most active recreational areas with an updated and accessible facility. The creative graffiti-style exterior ties the building to the skatepark environment, and the project reflects Boise City’s ongoing commitment to maintaining reliable public amenities for both its residents and visitors. For communities planning a similar restroom improvement, Romtec can provide information on available building options and can also meet your own unique project schedule and needs.

Don’t Just Take Our Word For It!

Thank you, Romtec team, the project came out wonderfully!

Department of Conservation and Natural Resources
Rating: 5

We were really impressed with the crew who came and constructed the pavilion, and the finished product is exactly as we envisioned. Thank you for helping us achieve this vision.

Fall River Valley
Rating: 5

Everyone is happy with the new restrooms. Thanks for all the hard work!

City of Irvine
Rating: 5

The end product is beautiful.

City of Reedley
Rating: 5

Thank you for everything and if/when there are jobs where we need something like this, Romtec will be at the top of the list!

Rock-N-Road Construction Inc
Rating: 5

We had an awesome experience with Romtec and were very pleased (especially) about the communication that was given to us. The project went by very smoothly and we are now off to our next adventures. The finished product was everything and more that was promised by Romtec.

Rock-N-Road Construction Inc
Rating: 5

We are very happy with how they are turning out. We have received positive feedback from the community.

City of Miamisburg Parks and Recreation
Rating: 5

That Memorial Park Project is one of our favorites too – it truly made a positive impact for our visitors, and we will continue to keep Romtec in mind as opportunities to collaborate come up!

San Mateo County
Rating: 5

I have to mention that aside from the products Romtec supplies and the workmanship of the subcontractors (Ken and crew), I’m also very impressed with your responsiveness to issues – you’re a far cry from the usual taillight warranty.

San Mateo County
Rating: 5

I am very happy with the product and the customer care. Thank you all for going the extra mile to make your products even better.

City of Rockaway Beach
Rating: 5

You get what you pay for. Romtec provided the most perfect, seamless, flawless project I could have imagined. I would use Romtec 100 times over and will not consider any other options moving forward. You were able to beat my original budget and expectations. Everyone involved was great from sales to construction management, to the construction team themselves.

City of Coos Bay
Rating: 5

I was actually out today looking at the baseball park and your building is absolutely awesome.  Our buddy and all star baseball families are going to love it!

Rockford Park District
Rating: 5

We were very impressed with Romtec on this project. The entire team was professional, forward thinking, wiling to collaborate and compromise, and the structure turned out beautiful. We definitely got what we paid for (and then some!).

Chico Area Recreation and Park District
Rating: 5

Ken Perry’s crew who installed it did a fantastic job, very organized and professional, and efficient install.

Poppy Holding, Inc.
Rating: 5

If I were to do this again, I would no doubt hire Romtec and its subcontractors to do the installation. Hindsight is always 20/20 and I learned a valuable lesson that I will hire Romtec’s certified installers to do the construction.

City of Spearfish
Rating: 5

I would be remiss if I didn’t mention Dan Keagy (Romtec’s assistant construction manager). He in my opinion went above and beyond to solve our problems and problems that were not necessarily his or Romtec’s to solve. He is a great guy and great resource for Romtec. Overall, the biggest thing to me was the service after the sale. Romtec didn’t just make the sale and move on, but they supported us through a very long and arduous construction process.

City of Spearfish
Rating: 5

Romtec was phenomenal when it came to service after the sale. They were available anytime there were questions. In addition, there were some issues with missing materials. Even though it was not Romtec’s fault for the missing materials, the were more than willing to send us the missing materials to get the project done. Romtec even sent out a representative to tour the site to give firsthand recommendations on how to proceed.

City of Spearfish
Rating: 5
Logo For Romtec

Tell Us About Your Project!

Lets get your project moving forward! Tell us about your project and our team will get to work on a personalized solution than meets your needs.

Back To Top