The park restroom facilities at Enterprise South Nature Park in Chattanooga, Tennessee, have been developed over time to support the park’s continued expansion and growth. Through multiple phases, Hamilton County has expanded restroom access across the park, starting with waterless facilities and progressing to the development of a modern plumbed restroom and shower building.

Project Gallery

park restroom facilities

Enterprise South Nature Park and Hamilton County

Enterprise South Nature Park is a large outdoor recreation area that supports hiking, biking, wildlife viewing, and many other outdoor recreation activities. As daily visitor use continues to grow, the demand for more reliable and functional amenities has increased.

Hamilton County has addressed this need through a long-term approach to infrastructure, implementing multiple park restroom facilities across the site. These buildings are strategically located to serve different areas of the park, improving accessibility for visitors and supporting a wide range of recreational uses throughout.

Project Overview: Multi-Phase Restroom Development

The park restroom infrastructure at Enterprise South Nature Park has been developed in multiple phases, each building upon the last to improve functionality and expand restroom access in the park.

Initial Installations (2012)

In 2012, two waterless vault restrooms were installed at the park. These facilities provided the first level of restroom access within the park, offering a durable and low-maintenance solution suited for early park development and the outdoor conditions.

These initial restroom buildings established a strong foundation for reliable amenities as park use began to increase.

Expansion Phase (2017)

As visitor traffic grew, two additional vault restrooms were added in 2017 to expand coverage across the park. These additional park restroom facilities improved accessibility for users in different locations, reducing travel distance to restroom areas and supporting higher visitor volumes.

The continued use of waterless restrooms in this phase maintained consistency and durability, while still addressing the increased demand for restrooms.

Current Development: Restroom and Shower Facility

The most recent phase includes a new plumbed park restroom and shower facility that will introduce expanded amenities to the park. This building will include both restrooms and showers, bringing a higher level of service to visitors who want to spend extended amounts of time engaging in recreational activities in the park.

This facility will complement the existing vault restrooms by providing an upgraded option in a centralized location. As part of the overall park restroom infrastructure, the new building will greatly enhance the range of amenities available throughout the park without replacing the existing installations.

Restroom and Shower Building Design

The new restroom and shower facility is designed to smoothly integrate into the already existing restroom facilities while also introducing new amenities to the park. As a restroom and shower building, it will provide enhanced amenities, while maintaining the durability required for outdoor environments.

Key design elements will include:

  • Durable construction, specifically designed to support long-term use
  • An integrated plumbing system to support both restrooms and showers
  • Fixtures chosen for reliability and ease of maintenance
  • Ventilation designed for both restroom and shower areas
  • A layout that is both accessible and private for users

This structure will serve as an upgrade to the broader restroom system by offering features that aren’t available in the existing, traditional vault restrooms.

Project Coordination and Implementation

Each phase of the restroom development at Enterprise South Nature Park has been coordinated alongside Hamilton County to align with the park’s growth and evolving needs.

The earlier vault restroom buildings were installed to ensure coverage across the park, while the current development phase will expand the system with a plumbed facility that brings additional functionality to the park. This phased approach allows the park restroom facilities to grow alongside increasing visitor demand, while remaining consistent.

Project Partners

This multi-phase project has been completed alongside Hamilton County as the owner, along with multiple other project partners involved in design and coordination across every phase.

Romtec provided the design and supply of the various park restroom facilities, including the vault restroom buildings that were installed in earlier phases, and the new restroom and shower building that is currently in development to expand the park’s facilities.

Benefits of Park Restroom Facilities

  • Provides restroom access across various locations within a large park
  • Combines waterless and plumbed facilities to suit different needs
  • Supports increasing visitor traffic over time
  • Improves accessibility for a variety of recreational activities
  • Adds amenities such as showers to support extended visits
  • Allows phased development to align with park growth

By implementing a variety of restroom types, the park has created a flexible system that can serve many unique needs for visitors to the park.

Conclusion

The development of multiple park restroom facilities at Enterprise South Nature Park clearly demonstrates how a phased approach can support long term growth in a public recreation space. Starting with the vault restrooms installed in 2012, to the expanding of coverage in 2017, to the development of a new restroom and shower facility, each phase has contributed greatly to improving accessibility and functionality across the entire park.

This progression highlights how the combination of different types of restroom facilities can create a system that evolves alongside the needs of visitors. Romtec works for each unique project to supply restroom solutions that support both current and future recreational needs.

Don’t Just Take Our Word For It!

Thank you, Romtec team, the project came out wonderfully!

Department of Conservation and Natural Resources
Rating: 5

We were really impressed with the crew who came and constructed the pavilion, and the finished product is exactly as we envisioned. Thank you for helping us achieve this vision.

Fall River Valley
Rating: 5

Everyone is happy with the new restrooms. Thanks for all the hard work!

City of Irvine
Rating: 5

The end product is beautiful.

City of Reedley
Rating: 5

Thank you for everything and if/when there are jobs where we need something like this, Romtec will be at the top of the list!

Rock-N-Road Construction Inc
Rating: 5

We had an awesome experience with Romtec and were very pleased (especially) about the communication that was given to us. The project went by very smoothly and we are now off to our next adventures. The finished product was everything and more that was promised by Romtec.

Rock-N-Road Construction Inc
Rating: 5

We are very happy with how they are turning out. We have received positive feedback from the community.

City of Miamisburg Parks and Recreation
Rating: 5

That Memorial Park Project is one of our favorites too – it truly made a positive impact for our visitors, and we will continue to keep Romtec in mind as opportunities to collaborate come up!

San Mateo County
Rating: 5

I have to mention that aside from the products Romtec supplies and the workmanship of the subcontractors (Ken and crew), I’m also very impressed with your responsiveness to issues – you’re a far cry from the usual taillight warranty.

San Mateo County
Rating: 5

I am very happy with the product and the customer care. Thank you all for going the extra mile to make your products even better.

City of Rockaway Beach
Rating: 5

You get what you pay for. Romtec provided the most perfect, seamless, flawless project I could have imagined. I would use Romtec 100 times over and will not consider any other options moving forward. You were able to beat my original budget and expectations. Everyone involved was great from sales to construction management, to the construction team themselves.

City of Coos Bay
Rating: 5

I was actually out today looking at the baseball park and your building is absolutely awesome.  Our buddy and all star baseball families are going to love it!

Rockford Park District
Rating: 5

We were very impressed with Romtec on this project. The entire team was professional, forward thinking, wiling to collaborate and compromise, and the structure turned out beautiful. We definitely got what we paid for (and then some!).

Chico Area Recreation and Park District
Rating: 5

Ken Perry’s crew who installed it did a fantastic job, very organized and professional, and efficient install.

Poppy Holding, Inc.
Rating: 5

If I were to do this again, I would no doubt hire Romtec and its subcontractors to do the installation. Hindsight is always 20/20 and I learned a valuable lesson that I will hire Romtec’s certified installers to do the construction.

City of Spearfish
Rating: 5

I would be remiss if I didn’t mention Dan Keagy (Romtec’s assistant construction manager). He in my opinion went above and beyond to solve our problems and problems that were not necessarily his or Romtec’s to solve. He is a great guy and great resource for Romtec. Overall, the biggest thing to me was the service after the sale. Romtec didn’t just make the sale and move on, but they supported us through a very long and arduous construction process.

City of Spearfish
Rating: 5

Romtec was phenomenal when it came to service after the sale. They were available anytime there were questions. In addition, there were some issues with missing materials. Even though it was not Romtec’s fault for the missing materials, the were more than willing to send us the missing materials to get the project done. Romtec even sent out a representative to tour the site to give firsthand recommendations on how to proceed.

City of Spearfish
Rating: 5
Logo For Romtec

Tell Us About Your Project!

Lets get your project moving forward! Tell us about your project and our team will get to work on a personalized solution than meets your needs.

Back To Top