Skip to content

Greenway Trail Restroom – Germantown, TN

Improving Visitor Comfort with Modern Restroom Buildings

In the Greenway Trail Restroom project, the City of Germantown, Tennessee, and HDR Engineering came to Romtec for the design and supply of a restroom structure to serve a new section of the Germantown Greenway Trail.

The Germantown Greenway Trail is a planned 22-mile trail system offering a pathway for walkers, runners, and bicyclists along Wolf River and throughout the natural areas such as the Wolf River Nature Area, the Lucius Burch State Natural Area, and the Shelby Farms Park areas. Thirteen of the planned 22 miles have been completed, beginning at Neshoba Park, and will eventually encircle the city to link parks, schools, and neighborhoods. (“Nature Areas and Special Facilities”, 2021)

Project Gallery

Multi-User Bathroom at Trail

To service the new section of the Greenway Trail, Romtec supplied a restroom to be constructed by Wagner General Contractors near Wolf River Nature Area and the Germantown Youth Education Pond. The restroom contains four single user restrooms, two designated for women and two designated for men. Each restroom is ADA compliant and has diaper decks for parents to easily tend to their small children’s needs.

In addition to diaper decks, the City of Germantown also opted for additional upgraded features to improve the users experience inside the restroom, such as the combination of natural and mechanical ventilation to fight odors and provide fresh air inside the structure; tankless water heaters for guests to wash their hands in warm water; and heated hand dryers for mess free hand drying.

The structure is composed of smooth face grey block with a slightly cool, neutral toned, stone veneer wainscot and board and batten siding. The roofing on this structure is a hardy metal roofing in weathered copper that continues the cool toned color scheme.

Romtec’s building package was shipped to the site and arrived with nearly all the components that Wagner General Contractors would need to construct the building. The successful installation of the structure has provided the City of Germantown with a new piece of public infrastructure along their Greenway Trail, which will continue to grow and improve over the coming years.

Nature Areas and Special Facilities. Germantown-tn.gov. (2021). Retrieved 4 October 2021, from https://www.germantown-tn.gov/play/parks-and-recreation.

Don’t Just Take Our Word For It!

Thank you, Romtec team, the project came out wonderfully!

Department of Conservation and Natural Resources
Rating: 5

We were really impressed with the crew who came and constructed the pavilion, and the finished product is exactly as we envisioned. Thank you for helping us achieve this vision.

Fall River Valley
Rating: 5

Everyone is happy with the new restrooms. Thanks for all the hard work!

City of Irvine
Rating: 5

The end product is beautiful.

City of Reedley
Rating: 5

Thank you for everything and if/when there are jobs where we need something like this, Romtec will be at the top of the list!

Rock-N-Road Construction Inc
Rating: 5

We had an awesome experience with Romtec and were very pleased (especially) about the communication that was given to us. The project went by very smoothly and we are now off to our next adventures. The finished product was everything and more that was promised by Romtec.

Rock-N-Road Construction Inc
Rating: 5

We are very happy with how they are turning out. We have received positive feedback from the community.

City of Miamisburg Parks and Recreation
Rating: 5

That Memorial Park Project is one of our favorites too – it truly made a positive impact for our visitors, and we will continue to keep Romtec in mind as opportunities to collaborate come up!

San Mateo County
Rating: 5

I have to mention that aside from the products Romtec supplies and the workmanship of the subcontractors (Ken and crew), I’m also very impressed with your responsiveness to issues – you’re a far cry from the usual taillight warranty.

San Mateo County
Rating: 5

I am very happy with the product and the customer care. Thank you all for going the extra mile to make your products even better.

City of Rockaway Beach
Rating: 5

You get what you pay for. Romtec provided the most perfect, seamless, flawless project I could have imagined. I would use Romtec 100 times over and will not consider any other options moving forward. You were able to beat my original budget and expectations. Everyone involved was great from sales to construction management, to the construction team themselves.

City of Coos Bay
Rating: 5

I was actually out today looking at the baseball park and your building is absolutely awesome.  Our buddy and all star baseball families are going to love it!

Rockford Park District
Rating: 5

We were very impressed with Romtec on this project. The entire team was professional, forward thinking, wiling to collaborate and compromise, and the structure turned out beautiful. We definitely got what we paid for (and then some!).

Chico Area Recreation and Park District
Rating: 5

Ken Perry’s crew who installed it did a fantastic job, very organized and professional, and efficient install.

Poppy Holding, Inc.
Rating: 5

If I were to do this again, I would no doubt hire Romtec and its subcontractors to do the installation. Hindsight is always 20/20 and I learned a valuable lesson that I will hire Romtec’s certified installers to do the construction.

City of Spearfish
Rating: 5

I would be remiss if I didn’t mention Dan Keagy (Romtec’s assistant construction manager). He in my opinion went above and beyond to solve our problems and problems that were not necessarily his or Romtec’s to solve. He is a great guy and great resource for Romtec. Overall, the biggest thing to me was the service after the sale. Romtec didn’t just make the sale and move on, but they supported us through a very long and arduous construction process.

City of Spearfish
Rating: 5

Romtec was phenomenal when it came to service after the sale. They were available anytime there were questions. In addition, there were some issues with missing materials. Even though it was not Romtec’s fault for the missing materials, the were more than willing to send us the missing materials to get the project done. Romtec even sent out a representative to tour the site to give firsthand recommendations on how to proceed.

City of Spearfish
Rating: 5
Logo For Romtec

Tell Us About Your Project!

Lets get your project moving forward! Tell us about your project and our team will get to work on a personalized solution than meets your needs.

Back To Top