Skip to content

Irvine, California – Park Office Building

A new park office building at Mike Ward Community Park in Irvine, California is designed to enhance both the public amenities and daily operations of the park. This project replaces an older, existing restroom structure with a modern facility that combines a public restroom and a dedicated office space for park management. By integrating these two elements into a single building, the City of Irvine is improving efficiency for its staff while also providing a durable and accessible restroom for all visitors. The new facility also helps to create a central location for staff maintenance and operations, improving the overall management of the park.

Project Gallery

Mike Ward Community Park and the City of Irvine

Mike Ward Community Park is an active recreational area located in Irvine, California. It accommodates a variety of different activities and visitors throughout the day. With the addition of new pickleball courts and other improvements to the park, the site is seeing an increased number of visitors, creating a greater need for more reliable restrooms and operating space for employees.

The City of Irvine regularly updates its parks to keep them functional and address changing demands from the surrounding community. This project is part of a larger effort to replace aging infrastructure with new, usable structures across the entire park system. By developing a park office building that also includes public restrooms, the city is addressing both the needs of visitors and staff at the park.

Project Overview: Replacing an Existing Facility

The main goal of this project was to replace an outdated restroom building with a more functional and durable facility. This updated facility serves as both a public restroom and a park operations space, giving the staff a dedicated area for daily management tasks. The new park office building was designed and supplied by Romtec, with installation completed by Environmental Construction Inc., the contractor awarded through the city’s bid process.

park office building

Restroom & Office Building Design and Architectural Details

The building includes multiple user restrooms, along with an attached office space designed for park employees’ daily use. Key features of the building include:

  • Durable concrete construction designed for long-term performance and daily use by park visitors
  • Interior design consistent with other City of Irvine projects
  • A customized exterior design that aligns with the design of the existing community center at the park
  • Updated plumbing fixtures that meet current standards
  • Layouts designed to improve accessibility

The office component provides a functional workplace for staff, while the restroom portion is designed to accommodate consistent, high-traffic use. This combination allows the building to serve multiple practical roles within the park without requiring two separate structures to be built.

Project Coordination and Schedule

The project required coordination between the City of Irvine, David Volz Design, and Romtec to complete the process of designing and permitting the project. Several rounds of plan review resulted in updates to both the building design and supporting elements, such as the electrical systems, lighting, and roofing details.

Following permitting, the city released the project for bid and awarded Environmental Construction Inc. as the general contractor. Construction included demolition of the existing restroom and site preparation prior to delivery. The new park office building was delivered once the site was ready, allowing installation to proceed in line with the schedule.

Project Partners

This project involved collaboration between multiple parties, including:

  • The owner, City of Irvine
  • David Volz Design
  • Environmental Construction Inc.
  • Romtec

TThe City of Irvine oversaw approvals and coordination, while David Volz Design assisted with permitting and plan development. Then, the installation was handled by Environmental Construction Inc.

Benefits of a Park Office Building

  • Provides both public restroom access for visitors and a dedicated space for park operations
  • Supports increased park usage with durable, long-lasting facilities
  • Improves park accessibility
  • Combines multiple important functions into one single, efficient structure
  • Aligns with the existing park architecture for a consistent appearance and aesthetics
  • Reduces the need for separate office and restroom buildings, making better use of available park space and resources

Conclusion

The Mike Ward Community Park project replaces an old, outdated restroom with a modern park office building that supports visitors and park staff. By combining the two important facilities, the building is extremely practical and serves multiple purposes.

This project demonstrates how a single structure can improve the overall functionality within a public park setting. For agencies considering similar upgrades, Romtec can provide information on building options and work together with project teams to meet specific design and scheduling requirements.

Don’t Just Take Our Word For It!

Thank you, Romtec team, the project came out wonderfully!

Department of Conservation and Natural Resources
Rating: 5

We were really impressed with the crew who came and constructed the pavilion, and the finished product is exactly as we envisioned. Thank you for helping us achieve this vision.

Fall River Valley
Rating: 5

Everyone is happy with the new restrooms. Thanks for all the hard work!

City of Irvine
Rating: 5

The end product is beautiful.

City of Reedley
Rating: 5

Thank you for everything and if/when there are jobs where we need something like this, Romtec will be at the top of the list!

Rock-N-Road Construction Inc
Rating: 5

We had an awesome experience with Romtec and were very pleased (especially) about the communication that was given to us. The project went by very smoothly and we are now off to our next adventures. The finished product was everything and more that was promised by Romtec.

Rock-N-Road Construction Inc
Rating: 5

We are very happy with how they are turning out. We have received positive feedback from the community.

City of Miamisburg Parks and Recreation
Rating: 5

That Memorial Park Project is one of our favorites too – it truly made a positive impact for our visitors, and we will continue to keep Romtec in mind as opportunities to collaborate come up!

San Mateo County
Rating: 5

I have to mention that aside from the products Romtec supplies and the workmanship of the subcontractors (Ken and crew), I’m also very impressed with your responsiveness to issues – you’re a far cry from the usual taillight warranty.

San Mateo County
Rating: 5

I am very happy with the product and the customer care. Thank you all for going the extra mile to make your products even better.

City of Rockaway Beach
Rating: 5

You get what you pay for. Romtec provided the most perfect, seamless, flawless project I could have imagined. I would use Romtec 100 times over and will not consider any other options moving forward. You were able to beat my original budget and expectations. Everyone involved was great from sales to construction management, to the construction team themselves.

City of Coos Bay
Rating: 5

I was actually out today looking at the baseball park and your building is absolutely awesome.  Our buddy and all star baseball families are going to love it!

Rockford Park District
Rating: 5

We were very impressed with Romtec on this project. The entire team was professional, forward thinking, wiling to collaborate and compromise, and the structure turned out beautiful. We definitely got what we paid for (and then some!).

Chico Area Recreation and Park District
Rating: 5

Ken Perry’s crew who installed it did a fantastic job, very organized and professional, and efficient install.

Poppy Holding, Inc.
Rating: 5

If I were to do this again, I would no doubt hire Romtec and its subcontractors to do the installation. Hindsight is always 20/20 and I learned a valuable lesson that I will hire Romtec’s certified installers to do the construction.

City of Spearfish
Rating: 5

I would be remiss if I didn’t mention Dan Keagy (Romtec’s assistant construction manager). He in my opinion went above and beyond to solve our problems and problems that were not necessarily his or Romtec’s to solve. He is a great guy and great resource for Romtec. Overall, the biggest thing to me was the service after the sale. Romtec didn’t just make the sale and move on, but they supported us through a very long and arduous construction process.

City of Spearfish
Rating: 5

Romtec was phenomenal when it came to service after the sale. They were available anytime there were questions. In addition, there were some issues with missing materials. Even though it was not Romtec’s fault for the missing materials, the were more than willing to send us the missing materials to get the project done. Romtec even sent out a representative to tour the site to give firsthand recommendations on how to proceed.

City of Spearfish
Rating: 5
Logo For Romtec

Tell Us About Your Project!

Lets get your project moving forward! Tell us about your project and our team will get to work on a personalized solution than meets your needs.

Back To Top