Skip to content

Orland Park, Illinois – Public Park Restroom Building

As park usage increased at Schussler Park, the Village of Orland Park identified the need for a permanent custom public park restroom building that could support daily use while accommodating larger sporting events. Schussler Park in Orland Park, Illinois serves as an active community destination for families, athletes, and local organizations throughout the year. Home to the Michael Schofield III Sports Complex, the park regularly hosts practices, games, and community gatherings that bring large numbers of visitors to the site.

Rather than pursuing a standard or predesigned structure, the Village sought a solution tailored specifically to the park’s layout, floodplain conditions, and long-term maintenance goals. Through collaboration with Wight & Company and Romtec, the Village was able to design a custom recreation restroom building and procure it efficiently using their Sourcewell cooperative purchasing membership.

This approach allowed Orland Park to receive a fully engineered, site-specific building design while still bidding installation work locally: saving time, managing costs, and keeping construction dollars within the community.

Project Gallery

A Community Park Restroom’s Streamlined Path from Romtec Design to Local Construction

The Village of Orland Park began the process by working directly with Romtec to develop a public park restroom building that aligned with the park improvement project. As part of Romtec’s no-cost early planning support, the Village was able to review layout options, building configurations, budgetary information, and design direction before making a purchasing decision. During early design discussions, multiple layout options were evaluated to balance user capacity, accessibility, and operational needs for park staff and youth sports organizations.

Once the design was finalized, the Village utilized Sourcewell to purchase the engineered plans and Romtec building kit directly. This cooperative purchasing method streamlined procurement by eliminating the need for a traditional design-bid process for the building itself while maintaining full transparency and compliance with public purchasing requirements.

With the building design and materials secured, the Village then sent the project out to bid to local contractors for installation. This hybrid approach provided several key advantages:

  • Reduced overall project timeline by separating design and construction procurement
  • Improved cost certainty through early design and budgeting
  • Allowed local contractors to perform site work and installation
  • Kept project labor and economic impact within the local community

The result was a custom municipal restroom facility delivered efficiently while supporting local construction partners.

Municipal Restroom Facility Designed for Daily Park Use, Game-Day Crowds, and Floodplain Conditions

The completed building is located near the athletic fields and bleachers, giving players, coaches, and spectators convenient access to restrooms during practices, games, and community events. The restroom entrances face the fields, improving visibility and ease of access during peak activity periods.

The final layout includes four standard restroom stalls, one separate family restroom, and two secure storage rooms. This configuration allows multiple users to access the facility at the same time while also providing a private, accessible option for families and caregivers.

On-site storage gives youth sports groups a secure place to store equipment, reducing setup time and improving event operations for park staff. An exterior drinking fountain allows visitors to refill water bottles without entering the restroom area, helping reduce congestion during busy events.

Additional features such as hand dryers, baby changing stations, security lighting, and durable finishes were incorporated to support cleanliness, safety, and long-term usability.

Because the building site is located within the one-hundred-year floodplain, flood-resistant design was a critical part of the project. Romtec worked closely with Wight & Company and the Village of Orland Park to incorporate passive flood-resistant construction methods that protect the structure during high-water events.

Flood vent placement and building elevations were designed to meet FEMA guidance and local building department requirements while maintaining an appearance consistent with the surrounding park improvements. The building also meets Americans with Disabilities Act accessibility standards, ensuring safe and comfortable use for visitors of all abilities.

Streamlined Design, Procurement, and Construction

The Schussler Park project demonstrates how early collaboration between municipalities, designers, contractors, and building partners can simplify complex public projects. By engaging Romtec early in the process, the Village of Orland Park gained access to no-cost design support, engineered drawings, clear specifications, and accurate budget information before construction began.

Romtec worked with Wight & Company to help develop a custom restroom and storage building that fits the park’s layout, floodplain requirements, user needs, and long-term maintenance goals. Once the design was finalized, the Village used Sourcewell to procure the Romtec building package while still bidding installation work locally.

Project Partners Included

Owner: Village of Orland Park / Orland Park Recreation
Landscape Architect: Wight & Company
General Contractor: V3 Construction Group, Ltd.
Permit Reviewer: Village of Orland Park Building Department

This project marks Romtec’s first collaboration with the Village of Orland Park and V3 Construction Group, Ltd., and continued a strong working relationship with Wight & Company following a previous project together in South Elgin, Illinois.

A Park Restroom Facility for Long- Lasting Performance

The new public park restroom building at Schussler Park represents more than a facility upgrade—it reflects a project delivery approach that prioritized customization, efficiency, and community benefit. By using Sourcewell to procure engineered plans and a building kit directly from Romtec, the Village of Orland Park was able to accelerate the project timeline while still engaging local contractors for installation.

The result is a durable, accessible, and flood-ready community park restroom that supports athletes, families, and visitors today while serving as a long-term asset for the park system. Through thoughtful planning and collaboration, the Village delivered a custom solution that enhances comfort, improves park functionality, and keeps investment within the local community.

Don’t Just Take Our Word For It!

Thank you, Romtec team, the project came out wonderfully!

Department of Conservation and Natural Resources
Rating: 5

We were really impressed with the crew who came and constructed the pavilion, and the finished product is exactly as we envisioned. Thank you for helping us achieve this vision.

Fall River Valley
Rating: 5

Everyone is happy with the new restrooms. Thanks for all the hard work!

City of Irvine
Rating: 5

The end product is beautiful.

City of Reedley
Rating: 5

Thank you for everything and if/when there are jobs where we need something like this, Romtec will be at the top of the list!

Rock-N-Road Construction Inc
Rating: 5

We had an awesome experience with Romtec and were very pleased (especially) about the communication that was given to us. The project went by very smoothly and we are now off to our next adventures. The finished product was everything and more that was promised by Romtec.

Rock-N-Road Construction Inc
Rating: 5

We are very happy with how they are turning out. We have received positive feedback from the community.

City of Miamisburg Parks and Recreation
Rating: 5

That Memorial Park Project is one of our favorites too – it truly made a positive impact for our visitors, and we will continue to keep Romtec in mind as opportunities to collaborate come up!

San Mateo County
Rating: 5

I have to mention that aside from the products Romtec supplies and the workmanship of the subcontractors (Ken and crew), I’m also very impressed with your responsiveness to issues – you’re a far cry from the usual taillight warranty.

San Mateo County
Rating: 5

I am very happy with the product and the customer care. Thank you all for going the extra mile to make your products even better.

City of Rockaway Beach
Rating: 5

You get what you pay for. Romtec provided the most perfect, seamless, flawless project I could have imagined. I would use Romtec 100 times over and will not consider any other options moving forward. You were able to beat my original budget and expectations. Everyone involved was great from sales to construction management, to the construction team themselves.

City of Coos Bay
Rating: 5

I was actually out today looking at the baseball park and your building is absolutely awesome.  Our buddy and all star baseball families are going to love it!

Rockford Park District
Rating: 5

We were very impressed with Romtec on this project. The entire team was professional, forward thinking, wiling to collaborate and compromise, and the structure turned out beautiful. We definitely got what we paid for (and then some!).

Chico Area Recreation and Park District
Rating: 5

Ken Perry’s crew who installed it did a fantastic job, very organized and professional, and efficient install.

Poppy Holding, Inc.
Rating: 5

If I were to do this again, I would no doubt hire Romtec and its subcontractors to do the installation. Hindsight is always 20/20 and I learned a valuable lesson that I will hire Romtec’s certified installers to do the construction.

City of Spearfish
Rating: 5

I would be remiss if I didn’t mention Dan Keagy (Romtec’s assistant construction manager). He in my opinion went above and beyond to solve our problems and problems that were not necessarily his or Romtec’s to solve. He is a great guy and great resource for Romtec. Overall, the biggest thing to me was the service after the sale. Romtec didn’t just make the sale and move on, but they supported us through a very long and arduous construction process.

City of Spearfish
Rating: 5

Romtec was phenomenal when it came to service after the sale. They were available anytime there were questions. In addition, there were some issues with missing materials. Even though it was not Romtec’s fault for the missing materials, the were more than willing to send us the missing materials to get the project done. Romtec even sent out a representative to tour the site to give firsthand recommendations on how to proceed.

City of Spearfish
Rating: 5
Logo For Romtec

Tell Us About Your Project!

Lets get your project moving forward! Tell us about your project and our team will get to work on a personalized solution than meets your needs.

Back To Top