Restroom with Roof Extension at Johnston Commons Park – Johnston, IA
This restroom features two unisex single user restrooms, a family room, a mechanical room, and a 24' Roof Extension.
This restroom features two unisex single user restrooms, a family room, a mechanical room, and a 24' Roof Extension.
Romtec provided a new 2-stall multi-user restroom that is being purchased directly by the City of Fairfax with a mechanical room.
A restroom & concession building and two storage buildings were purchased directly as “turnkey” buildings for South Fontana Sports Park.
Quartz Park was developed because Redmond wanted to provide a building that could be open year-round which included a restroom and pavilion.
Romtec provided a multi-purpose restroom building with concessions and storage space for Poly Vista Park in Billings, MT.
The City of Wilsonville wanted to upgrade the main restroom building at Memorial Park. Romtec provided them with a complete turnkey building.
Romtec worked with Design Concepts on the drawings and specifications for this waterless vault restroom for Highland Lake Recreation Area.
The City of Carlsbad has been a customer of Romtec before and wanted to upgrade their restroom facility at Poinsettia Park.
This Texas restroom is part of a turnkey project that included a new playground, pavilion, shaded seating areas, and parking.
This Illinois Romtec building features restroom, showers, a pump pit for the splash pad, and a mechanical room.
Highline Lake State Park was looking for a pre-designed option to help speed up the replacement process up.
White Bear Township wanted two new restrooms at Polar Lakes Park with upgraded siding and vandal-resistant options for a seasonal facility.