Southeast Houghton Area Recharge Project – Tucson, AZ

In the SHARP Restrooms project, Romtec worked with Tucson Water on the Southeast Houghton Area Recharge Project (SHARP), a one-of-a-kind project that combines water recycling and the creation of a new green area for the public to enjoy. The unique story and design of this project is leading the way for more water recycling sites and was recently covered in the Arizona Parks and Recreation Association (APRA) official Fall 2021 publication.

Water recycling and water re-use are growing infrastructure concerns as the demand for water increases. The SHARP project is designed to handle these concerns head on, with nearly 7 acres of the SHARP site dedicated to 3 water basins that can recharge 1.3 billion gallons of recycled water per year. The basins receive recycled water from the Houghton Reclaimed Reservoir in Tucson, AZ, and feed into an aquifer 350 feet underground that stores water for future use such as irrigation, industrial usage, and firefighting.
The water recharge site is also open to the public as a green space for the community to enjoy, with over 500 trees, 906 flowering shrubs, and 338 cacti and bushes planted. Walking/running trails and three Ramadas (covered shelters) with picnic tables are placed throughout the site and between the basins for guests to walk throughout the site and enjoy the atmosphere.

One of the purposes of the site is to perform as an “educational facility for the community and a place for local school children to learn about water resources, recharge, and rainwater harvesting”, according to Beth Scully, Tucson Water’s Lead Hydrologist. With the SHARP site acting as a park and outdoor classroom in addition to a water recycling site, it was important to have facilities that guests could use during educational outings and fieldtrips. To satisfy these needs, Romtec supplied two restroom structures onsite for guests. (Duncan, 2021)

The larger of the Romtec restrooms in Tucson supplied for this project consists of 4 individual, unisex restrooms that are ADA compliant and feature diaper decks. A central mechanical room in this structure provides storage areas and easy access to plumbing and mechanical for maintenance. The smaller of the two structures is a stand-alone, single user restroom. Both buildings in Arizona are composed of split face block with a metal roofing, and wire mesh gable vents for natural ventilation inside the structure.

The Romtec structures were constructed onsite in Tucson, Arizona by Borderland Construction Company, and the successful installation of the buildings will allow guests of all types to visit the site and spend the day learning about water recycling and reclamation. Tucson Water has gone to great lengths and invested time, money, and an incredible effort to produce a facility that will address water concerns and engage the public.

Duncan, H. (2021). Tucson’s Southeast Houghton Area Recharge Project. Arizona Parks & Recreation Association, (Fall 2021), 8. Retrieved 12 October 2021.

Project Gallery

Don’t Just Take Our Word For It!

Thank you, Romtec team, the project came out wonderfully!

Department of Conservation and Natural Resources
Rating: 5

We were really impressed with the crew who came and constructed the pavilion, and the finished product is exactly as we envisioned. Thank you for helping us achieve this vision.

Fall River Valley
Rating: 5

Everyone is happy with the new restrooms. Thanks for all the hard work!

City of Irvine
Rating: 5

The end product is beautiful.

City of Reedley
Rating: 5

Thank you for everything and if/when there are jobs where we need something like this, Romtec will be at the top of the list!

Rock-N-Road Construction Inc
Rating: 5

We had an awesome experience with Romtec and were very pleased (especially) about the communication that was given to us. The project went by very smoothly and we are now off to our next adventures. The finished product was everything and more that was promised by Romtec.

Rock-N-Road Construction Inc
Rating: 5

We are very happy with how they are turning out. We have received positive feedback from the community.

City of Miamisburg Parks and Recreation
Rating: 5

That Memorial Park Project is one of our favorites too – it truly made a positive impact for our visitors, and we will continue to keep Romtec in mind as opportunities to collaborate come up!

San Mateo County
Rating: 5

I have to mention that aside from the products Romtec supplies and the workmanship of the subcontractors (Ken and crew), I’m also very impressed with your responsiveness to issues – you’re a far cry from the usual taillight warranty.

San Mateo County
Rating: 5

I am very happy with the product and the customer care. Thank you all for going the extra mile to make your products even better.

City of Rockaway Beach
Rating: 5

You get what you pay for. Romtec provided the most perfect, seamless, flawless project I could have imagined. I would use Romtec 100 times over and will not consider any other options moving forward. You were able to beat my original budget and expectations. Everyone involved was great from sales to construction management, to the construction team themselves.

City of Coos Bay
Rating: 5

I was actually out today looking at the baseball park and your building is absolutely awesome.  Our buddy and all star baseball families are going to love it!

Rockford Park District
Rating: 5

We were very impressed with Romtec on this project. The entire team was professional, forward thinking, wiling to collaborate and compromise, and the structure turned out beautiful. We definitely got what we paid for (and then some!).

Chico Area Recreation and Park District
Rating: 5

Ken Perry’s crew who installed it did a fantastic job, very organized and professional, and efficient install.

Poppy Holding, Inc.
Rating: 5

If I were to do this again, I would no doubt hire Romtec and its subcontractors to do the installation. Hindsight is always 20/20 and I learned a valuable lesson that I will hire Romtec’s certified installers to do the construction.

City of Spearfish
Rating: 5

I would be remiss if I didn’t mention Dan Keagy (Romtec’s assistant construction manager). He in my opinion went above and beyond to solve our problems and problems that were not necessarily his or Romtec’s to solve. He is a great guy and great resource for Romtec. Overall, the biggest thing to me was the service after the sale. Romtec didn’t just make the sale and move on, but they supported us through a very long and arduous construction process.

City of Spearfish
Rating: 5

Romtec was phenomenal when it came to service after the sale. They were available anytime there were questions. In addition, there were some issues with missing materials. Even though it was not Romtec’s fault for the missing materials, the were more than willing to send us the missing materials to get the project done. Romtec even sent out a representative to tour the site to give firsthand recommendations on how to proceed.

City of Spearfish
Rating: 5
Logo For Romtec

Tell Us About Your Project!

Lets get your project moving forward! Tell us about your project and our team will get to work on a personalized solution than meets your needs.

Back To Top