Vancouver, Washington – Trailhead Restroom Pavilion

A new trailhead restroom pavilion is being designed by Romtec as part of the Heritage Farm Public Access Improvements project in Clark County, Washington. The facility is planned to provide restroom access, covered gathering space, and operational amenities for visitors using the property. It is intended to improve public access while advancing the long-term vision for recreation, trails, and outdoor activities at Heritage Farm.

Romtec is designing and supplying the facility, which combines multiple functions within a single structure. Once constructed, it will provide a welcoming entry point for visitors while supporting recreational use throughout the site.

Project Gallery

Opening Heritage Farm to the Public

Clark County is improving Heritage Farm to expand public access while creating new opportunities for recreation, outdoor education, and community use.

As part of these improvements, the County is developing infrastructure that will help visitors comfortably access and enjoy the site. Projects of this scale require infrastructure that supports trails, gathering spaces, and recreation while preserving the property’s natural and rural character.

The planned restroom pavilion will become one of the primary visitor amenities within the Heritage Farm site.

Supporting Recreation and Visitor Access

The planned building is designed to serve a wide variety of visitors using the property. The facility is being designed to support:

  • Trail users
  • Families and visitors
  • Community gatherings
  • Educational activities
  • Outdoor recreation programs
  • Future public events

By combining restrooms, storage, and covered gathering space within a single structure, the building will help improve visitor comfort while supporting long-term site operations. The design reflects Clark County’s goal of creating a recreation destination that is both functional and welcoming.

A Building with Multiple Functions

One of the unique aspects of this project is that the structure serves several purposes within a single building.

Restroom Facilities

Current plans include three individual unisex restrooms designed to provide accessible facilities for visitors.

Individual restroom rooms offer greater flexibility, privacy, and convenience than traditional gang-style layouts.

Storage and Operations Space

The plans also include dedicated storage areas and a mechanical room.

These spaces are intended to accommodate maintenance equipment and operational supplies needed to manage the facility and surrounding recreation areas.

Covered Pavilion Space

An attached open-air pavilion creates a sheltered gathering space for visitors.

The pavilion will provide shelter from weather while giving guests a place to gather, rest, or participate in activities. Combining enclosed restroom facilities with an open-air pavilion creates a building that serves a wider range of recreation and community needs than a traditional park restroom.

Designed for Heritage Farm

The architecture of the trailhead restroom pavilion was developed to fit the character of the Heritage Farm property.

Planned features include:

  • Heavy timber framing
  • Open-air pavilion
  • Metal roofing
  • Three individual unisex restrooms
  • Storage rooms
  • Mechanical room
  • Covered gathering space

 

The design combines functional utility spaces with visitor amenities while complementing the surrounding landscape. Once completed, the facility will support public access while reflecting the rural character of Heritage Farm.

Project Challenges

 

One of the project’s primary design challenges is balancing public access with long-term site management.

Because the property is being transformed into a public recreation destination, facilities must be able to accommodate visitors while remaining durable and easy to maintain. The design team also needed to incorporate multiple functions into a single structure without creating an oversized or intrusive building.

Another challenge involved creating facilities that support future recreation uses while remaining adaptable to changing public needs as the Heritage Farm improvements continue to evolve.

Careful planning was necessary to ensure the building supports both current and future recreational opportunities.

Creating a Flexible Recreation Facility

 

Romtec worked with the project team to design a building that combines restrooms, storage, mechanical systems, and covered gathering space within a single coordinated structure.

The approach allows multiple site needs to be addressed within a single facility rather than constructing several separate structures. This improves efficiency while helping create a central visitor amenity for the Heritage Farm property.

By integrating functional support spaces with public gathering areas, the design provides flexibility for day-to-day recreation as well as future events and activities.

Conclusion

 

The Heritage Farm project demonstrates how a trailhead restroom pavilion can provide more than basic restroom access. By combining restrooms, storage, mechanical space, and covered gathering areas within one structure, the planned facility will improve visitor amenities while supporting long-term recreation goals.

Once completed, the building will become an important part of the Heritage Farm Public Access Improvements project by providing essential amenities for visitors and supporting outdoor recreation. As Clark County continues developing the property, the facility will help establish the foundation for future public access and recreation opportunities.

Delivering restroom buildings across multiple active forest preserves required careful planning, flexibility, and close coordination. Each site had different access conditions, schedules, and review needs, all while remaining open to the public. By identifying challenges early and adjusting as conditions changed, the overall program stayed on track without disrupting park operations.

Romtec’s project management team supported the County and contractor from stamped, engineered plans through fully installed facilities. Clear communication and consistent scheduling across all locations allowed the restroom buildings to be delivered ahead of schedule while keeping each site moving forward smoothly.

The completed facilities now provide DuPage County visitors with reliable, comfortable, and durable restroom buildings designed for heavy public use. These improvements represent a long-term investment in park infrastructure that enhances the visitor experience, supports daily operations, and serves the community for years to come.

Don’t Just Take Our Word For It!

Thank you, Romtec team, the project came out wonderfully!

Department of Conservation and Natural Resources
Rating: 5

We were really impressed with the crew who came and constructed the pavilion, and the finished product is exactly as we envisioned. Thank you for helping us achieve this vision.

Fall River Valley
Rating: 5

Everyone is happy with the new restrooms. Thanks for all the hard work!

City of Irvine
Rating: 5

The end product is beautiful.

City of Reedley
Rating: 5

Thank you for everything and if/when there are jobs where we need something like this, Romtec will be at the top of the list!

Rock-N-Road Construction Inc
Rating: 5

We had an awesome experience with Romtec and were very pleased (especially) about the communication that was given to us. The project went by very smoothly and we are now off to our next adventures. The finished product was everything and more that was promised by Romtec.

Rock-N-Road Construction Inc
Rating: 5

We are very happy with how they are turning out. We have received positive feedback from the community.

City of Miamisburg Parks and Recreation
Rating: 5

That Memorial Park Project is one of our favorites too – it truly made a positive impact for our visitors, and we will continue to keep Romtec in mind as opportunities to collaborate come up!

San Mateo County
Rating: 5

I have to mention that aside from the products Romtec supplies and the workmanship of the subcontractors (Ken and crew), I’m also very impressed with your responsiveness to issues – you’re a far cry from the usual taillight warranty.

San Mateo County
Rating: 5

I am very happy with the product and the customer care. Thank you all for going the extra mile to make your products even better.

City of Rockaway Beach
Rating: 5

You get what you pay for. Romtec provided the most perfect, seamless, flawless project I could have imagined. I would use Romtec 100 times over and will not consider any other options moving forward. You were able to beat my original budget and expectations. Everyone involved was great from sales to construction management, to the construction team themselves.

City of Coos Bay
Rating: 5

I was actually out today looking at the baseball park and your building is absolutely awesome.  Our buddy and all star baseball families are going to love it!

Rockford Park District
Rating: 5

We were very impressed with Romtec on this project. The entire team was professional, forward thinking, wiling to collaborate and compromise, and the structure turned out beautiful. We definitely got what we paid for (and then some!).

Chico Area Recreation and Park District
Rating: 5

Ken Perry’s crew who installed it did a fantastic job, very organized and professional, and efficient install.

Poppy Holding, Inc.
Rating: 5

If I were to do this again, I would no doubt hire Romtec and its subcontractors to do the installation. Hindsight is always 20/20 and I learned a valuable lesson that I will hire Romtec’s certified installers to do the construction.

City of Spearfish
Rating: 5

I would be remiss if I didn’t mention Dan Keagy (Romtec’s assistant construction manager). He in my opinion went above and beyond to solve our problems and problems that were not necessarily his or Romtec’s to solve. He is a great guy and great resource for Romtec. Overall, the biggest thing to me was the service after the sale. Romtec didn’t just make the sale and move on, but they supported us through a very long and arduous construction process.

City of Spearfish
Rating: 5

Romtec was phenomenal when it came to service after the sale. They were available anytime there were questions. In addition, there were some issues with missing materials. Even though it was not Romtec’s fault for the missing materials, the were more than willing to send us the missing materials to get the project done. Romtec even sent out a representative to tour the site to give firsthand recommendations on how to proceed.

City of Spearfish
Rating: 5
Logo For Romtec

Tell Us About Your Project!

Lets get your project moving forward! Tell us about your project and our team will get to work on a personalized solution than meets your needs.

Back To Top