Skip to content

Arcata, California Sidewalk Restroom Park Renovation

For this sidewalk restroom park renovation, Romtec provided the design and supply of this building for the City of Arcata for their Carlson Park renovations.

Arcata is a city on the northwest coastline of California, where the Mad River flows through the town. The city received some grants to renovate the park by providing river access, improving trails, adding a playground, an event area, and a new restroom. This renovation is unique as the park is one of the only river access points in the city.

The city wanted a local artist to paint a mural on the restroom, once it was installed, to highlight local wildlife and plants in this area. The restroom was a huge success to the local community.

The sidewalk restroom features an ADA restroom with a trench drain, outdoor sink, and many louvered vents, making it a compact and vandal proof structure. The sidewalk restroom is an affordable option which makes for easy installation and overall maintenance.

Project Gallery

Arcata, California Sidewalk Restroom Park Renovation

Arcata California Park Renovation Project

Arcata is a city on the northern coastline of California that sits along the infamous U.S. Route 101.

The city is next to Arcata Bay which is part of Humboldt Bay in Humboldt County.

The population of Arcata was 18,857 as of the 2020 census. The city was founded in 1850 and later renamed Arcata in 1860. It is about 280 miles north of San Francisco and is the home of California State Polytechnic University, Humboldt.

Carlson Park is 19 acre park in Arcata located next to the Mad River featuring pickleball courts, walking trails, a playground, and grassy areas.

Arcata, California Sidewalk Restroom Park Renovation

Sidewalk Restroom Park Renovation

The City of Arcata has received numerous grants to renovate Carlson Park and add on features including improved trails, river access, a playground, picnic and event area, parking lot and restroom. The park is one of the only city owned river access points.

The new playground features a theme to include local wildlife and outdoor recreation elements as the playground is situated near the new river access point and other new recreation features being developed around the park.

Romtec worked with the City of Arcata to provide the Romtec sidewalk restroom. The sidewalk restroom features a single user ADA restroom with a trench drain, outdoor sink, and louvered vents, which provide a compact and vandal resistant restroom. This is a highly ventilated restroom that is cost effective, with easy installation and maintenance. The sink on the outside of the building is a great way to prioritize affordability. Removing the sink allows us to lower the footprint of the building while still meeting all ADA requirements. The city liked that the sidewalk restroom uses standard products that are more readily available, improving the maintenance experience for their crew.

The City of Arcata was a first-time customer for Romtec, and they determined that it would be beneficial to utilize the Sourcewell purchasing contract to procure our building. Purchasing contracts take the hassle out of purchasing for government entities and saved the City money on the project.

Arcata, California Sidewalk Restroom Park Renovation

Vandal Proof Restroom

After installation, they City of Arcata hired a local artist to paint a mural on the side of the building. The restroom painting features a river and various wildlife local to the Arcata area which adds a local flair to this sidewalk restroom.

Painting the restroom is also a tactic for protecting the building’s integrity. Local vandals have been found to be less inclined to tag a piece of art.

Vandal Resistant Sidewalk Restroom

Romtec was pleased to provide the design and supply of this sidewalk restroom.

This sidewalk restroom park renovation is a prime example of how Romtec provides designs that meet the changing needs of park and recreation systems across a variety of needs and spectrums.

This is a unique restroom for a park update at Carlson Park in Arcata, California for the City of Arcata, in partnership with Hooven and Co., who installed the building. Hooven and Co. LLC is general engineering contractor who specializes in commercial, wetland and residential excavation and sitework construction for over 30 years.

Romtec designs, supplies, and constructs restroom buildings for park departments all over the country to fit the needs of each specific project. Our team of designers work to create a park and recreation structure that fits the specific site and location. We came up with the sidewalk restroom park renovation design, as a cost effective option, that is easy to install and maintain.

Don’t Just Take Our Word For It!

Thank you, Romtec team, the project came out wonderfully!

Department of Conservation and Natural Resources
Rating: 5

We were really impressed with the crew who came and constructed the pavilion, and the finished product is exactly as we envisioned. Thank you for helping us achieve this vision.

Fall River Valley
Rating: 5

Everyone is happy with the new restrooms. Thanks for all the hard work!

City of Irvine
Rating: 5

The end product is beautiful.

City of Reedley
Rating: 5

Thank you for everything and if/when there are jobs where we need something like this, Romtec will be at the top of the list!

Rock-N-Road Construction Inc
Rating: 5

We had an awesome experience with Romtec and were very pleased (especially) about the communication that was given to us. The project went by very smoothly and we are now off to our next adventures. The finished product was everything and more that was promised by Romtec.

Rock-N-Road Construction Inc
Rating: 5

We are very happy with how they are turning out. We have received positive feedback from the community.

City of Miamisburg Parks and Recreation
Rating: 5

That Memorial Park Project is one of our favorites too – it truly made a positive impact for our visitors, and we will continue to keep Romtec in mind as opportunities to collaborate come up!

San Mateo County
Rating: 5

I have to mention that aside from the products Romtec supplies and the workmanship of the subcontractors (Ken and crew), I’m also very impressed with your responsiveness to issues – you’re a far cry from the usual taillight warranty.

San Mateo County
Rating: 5

I am very happy with the product and the customer care. Thank you all for going the extra mile to make your products even better.

City of Rockaway Beach
Rating: 5

You get what you pay for. Romtec provided the most perfect, seamless, flawless project I could have imagined. I would use Romtec 100 times over and will not consider any other options moving forward. You were able to beat my original budget and expectations. Everyone involved was great from sales to construction management, to the construction team themselves.

City of Coos Bay
Rating: 5

I was actually out today looking at the baseball park and your building is absolutely awesome.  Our buddy and all star baseball families are going to love it!

Rockford Park District
Rating: 5

We were very impressed with Romtec on this project. The entire team was professional, forward thinking, wiling to collaborate and compromise, and the structure turned out beautiful. We definitely got what we paid for (and then some!).

Chico Area Recreation and Park District
Rating: 5

Ken Perry’s crew who installed it did a fantastic job, very organized and professional, and efficient install.

Poppy Holding, Inc.
Rating: 5

If I were to do this again, I would no doubt hire Romtec and its subcontractors to do the installation. Hindsight is always 20/20 and I learned a valuable lesson that I will hire Romtec’s certified installers to do the construction.

City of Spearfish
Rating: 5

I would be remiss if I didn’t mention Dan Keagy (Romtec’s assistant construction manager). He in my opinion went above and beyond to solve our problems and problems that were not necessarily his or Romtec’s to solve. He is a great guy and great resource for Romtec. Overall, the biggest thing to me was the service after the sale. Romtec didn’t just make the sale and move on, but they supported us through a very long and arduous construction process.

City of Spearfish
Rating: 5

Romtec was phenomenal when it came to service after the sale. They were available anytime there were questions. In addition, there were some issues with missing materials. Even though it was not Romtec’s fault for the missing materials, the were more than willing to send us the missing materials to get the project done. Romtec even sent out a representative to tour the site to give firsthand recommendations on how to proceed.

City of Spearfish
Rating: 5
Logo For Romtec

Tell Us About Your Project!

Lets get your project moving forward! Tell us about your project and our team will get to work on a personalized solution than meets your needs.

Back To Top