Skip to content

Blog

Accessible Restroom with Drinking Fountains

How Romtec Works with Landscape Architects

Landscape…

Read more
Large Maintenance Building with Vehicle Bays

Large Maintenance Buildings

Romtec…

Read more
Concession Restroom with Single Slope Roof

Case Study: Lions Field in Fullerton, California

For nearly a decade and a half, the Lion’s Field Park in Fullerton California, has been planning to renovate their sports park. They have some much needed renovations in their plans including new restrooms and concession stands.

Read more
Park Splash Pad

Case Study: Aztec, NM

The City of Aztec in New Mexico had a nice problem on their hands when a reservoir project came in under budget: what to do with the excess funds? Romtec played a part in resolving their dilemma by installing two, turnkey restroom projects.

Read more
National Cold War Memorial Public Restroom Building

Cold War Memorial Flyover

Romtec recently completed a very special project called the Spring Mountains Visitor Gateway, home of the National Cold War Memorial just outside of Las Vegas, Nevada. This project began over 15 years ago, though Romtec only became involved 3 years ago.

Read more
Western Themed Stucco Restroom Building

Case Study: Turtleback Zoo’s Big Cat Exhibit

The City of West Orange at Turtleback Zoo recently added a “Big Cat Exhibit,” to their outstanding upgrades they have been doing over the past few years. The exhibit has become very popular since it opened in 2011, bringing thousands of people in to see the big cats in their new homes; the exhibit has two jaguars and two cougars.

Read more
Brown Campground Shower and Restroom Building

Get Turnkey Construction with Romtec

Romtec…

Read more
Custom Concession Restroom Facility

Case Study: miniGOLF Safari in West Orange, NJ

The City of West Orange, NJ just finished building their beautiful African Safari themed mini golf course. The mini golf course has become a very popular attraction since it opened a little over 3 years ago.With the mini golf course becoming so popular, the City of West Orange wanted to add a restroom/concession stand.

Read more
Prefabricated Log Cabin on Concrete Slab

Romtec Prefabricated and Site-Built Cabins

Romtec…

Read more
Robust Storm Shelter

New Romtec Product: Storm Shelters

Romtec…

Read more
Great Looking Vault Toilet Structure at Golf Course

Case Study: Pecan Valley

Romtec designed, supplied, and installed waterless restroom buildings for Pecan Valley Golf Course.

Read more
Custom Brick Restroom in Park

Window and Skylight Options from Romtec

Windows…

Read more

Ready to Get Started?

Fill out our short and easy form and receive quote on any building.

We were really impressed with the crew who came and constructed the pavilion, and the finished product is exactly as we envisioned. Thank you for helping us achieve this vision.

Fall River Valley
Rating: 5

Everyone is happy with the new restrooms. Thanks for all the hard work!

City of Irvine
Rating: 5

The end product is beautiful.

City of Reedley
Rating: 5

Thank you for everything and if/when there are jobs where we need something like this, Romtec will be at the top of the list!

Rock-N-Road Construction Inc
Rating: 5

We had an awesome experience with Romtec and were very pleased (especially) about the communication that was given to us. The project went by very smoothly and we are now off to our next adventures. The finished product was everything and more that was promised by Romtec.

Rock-N-Road Construction Inc
Rating: 5

We are very happy with how they are turning out. We have received positive feedback from the community.

City of Miamisburg Parks and Recreation
Rating: 5

That Memorial Park Project is one of our favorites too – it truly made a positive impact for our visitors, and we will continue to keep Romtec in mind as opportunities to collaborate come up!

San Mateo County
Rating: 5

I have to mention that aside from the products Romtec supplies and the workmanship of the subcontractors (Ken and crew), I’m also very impressed with your responsiveness to issues – you’re a far cry from the usual taillight warranty.

San Mateo County
Rating: 5

I am very happy with the product and the customer care. Thank you all for going the extra mile to make your products even better.

City of Rockaway Beach
Rating: 5

You get what you pay for. Romtec provided the most perfect, seamless, flawless project I could have imagined. I would use Romtec 100 times over and will not consider any other options moving forward. You were able to beat my original budget and expectations. Everyone involved was great from sales to construction management, to the construction team themselves.

City of Coos Bay
Rating: 5

I was actually out today looking at the baseball park and your building is absolutely awesome.  Our buddy and all star baseball families are going to love it!

Rockford Park District
Rating: 5

We were very impressed with Romtec on this project. The entire team was professional, forward thinking, wiling to collaborate and compromise, and the structure turned out beautiful. We definitely got what we paid for (and then some!).

Chico Area Recreation and Park District
Rating: 5

Ken Perry’s crew who installed it did a fantastic job, very organized and professional, and efficient install.

Poppy Holding, Inc.
Rating: 5

If I were to do this again, I would no doubt hire Romtec and its subcontractors to do the installation. Hindsight is always 20/20 and I learned a valuable lesson that I will hire Romtec’s certified installers to do the construction.

City of Spearfish
Rating: 5

I would be remiss if I didn’t mention Dan Keagy (Romtec’s assistant construction manager). He in my opinion went above and beyond to solve our problems and problems that were not necessarily his or Romtec’s to solve. He is a great guy and great resource for Romtec. Overall, the biggest thing to me was the service after the sale. Romtec didn’t just make the sale and move on, but they supported us through a very long and arduous construction process.

City of Spearfish
Rating: 5

Romtec was phenomenal when it came to service after the sale. They were available anytime there were questions. In addition, there were some issues with missing materials. Even though it was not Romtec’s fault for the missing materials, the were more than willing to send us the missing materials to get the project done. Romtec even sent out a representative to tour the site to give firsthand recommendations on how to proceed.

City of Spearfish
Rating: 5
Logo For Romtec

Tell Us About Your Project!

Lets get your project moving forward! Tell us about your project and our team will get to work on a personalized solution than meets your needs.

"*" indicates required fields

Subscribe to our Newsletter
Back To Top