Restroom with Roof Extension at Johnston Commons Park – Johnston, IA
This restroom features two unisex single user restrooms, a family room, a mechanical room, and a 24' Roof Extension.
This restroom features two unisex single user restrooms, a family room, a mechanical room, and a 24' Roof Extension.
Romtec provided a new 2-stall multi-user restroom that is being purchased directly by the City of Fairfax with a mechanical room.
A restroom & concession building and two storage buildings were purchased directly as “turnkey” buildings for South Fontana Sports Park.
Quartz Park was developed because Redmond wanted to provide a building that could be open year-round which included a restroom and pavilion.
Romtec provided a multi-purpose restroom building with concessions and storage space for Poly Vista Park in Billings, MT.
This project includes the supply and installation of a turnkey waterless restroom at the Seney Show Pool Shelter site.
The United States Army Core of Engineers reached out to Romtec for a custom cedar log pavilion for the Pokegama Dam Recreation Area.
Romtec provided four site-built waterless restrooms to Pinal County's Peralta Regional Park in Gold Canyon, Arizona.
Romtec worked through the preliminary design with Dawood Engineering for a single-user restroom with an attached 20' picnic shelter that is going into a very tight space on site.
Romtec provided a restroom and shower building which features six restrooms, six showers, and a mechanical room.
Romtec provided a restroom that features two waterless unisex restrooms, cedar board and batt siding, and a kick resistant vent.
Romtec provided turnkey services for this project where we designed, supplied, and built the ADA all-gender restroom building.