Skip to content

Wabash Trail – Lagro, IN

In the Wabash River Trail project, Romtec supplied a custom restroom building as part of an ongoing project to create a multi-use trail in Lagro, Indiana. A multi-phase project, this trail will follow the river and visitors can expect to “experience the best of the region’s small towns, active communities, pastoral landscapes, farm country, and historic features”, according to the Wabash River Trail Inc.’s website.

This multi-use trail is being developed by the Wabash River Trail (WRT) Inc. to bring more opportunities for outdoor recreation. It has a proposed length of 33 miles following along the Wabash river for most of its length and connecting to neighboring towns.

The trails will give residents an area to walk or bike, and open up outdoor areas for visitors to enjoy. In addition to the trails themselves, WRT Inc. plans for amenities such as trailheads, restrooms, river access sites, and more, to be constructed throughout the project.

Project Gallery

Riverside Restroom for Public Trail System

The Romtec supplied building is a part of Phase 1A of the project. The building is a custom 2022 Sierra II Compact, with two unisex restrooms on the face of the building, and a mechanical room on the back. The entrance to the restrooms is covered with a gable roof extension, and a privacy wall, stretching across both entrances. The combination of the roof extension and privacy wall creates a breezeway like entrance for the restrooms, and shields the face of the building from the elements.

This hardy building is composed of split face block in a castle tan color with a stone wainscot accent by the installer, Mike Reed Construction. The privacy wall at the front of the building is composed of stone wainscot (by installer) and topped with a lumber privacy screen, mixing natural materials and providing a pleasing look for the restroom. The roof of this structure is composed of a metal in regal blue and matches the blue dual water fountain placed along the side of the building.

Inside of the building, the restroom walls are lined with Fiberglass Reinforced Panels (FRP), wall liners in bright white with a traditional pebble finish. The FRP liners provide a finished look to the restroom and will be easy to clean or replace. The fixtures in the restrooms are hardy, stainless steel, wall mounted fixtures that will be resistant to vandalism and damage.

To go the extra mile for guests, WRT, Inc. also opted for additional features to improve guest experiences. One additional feature is the inclusion of baby changing stations in the restrooms, which will allow parents on the trail to tend to their children in the privacy of the restroom. Heaters are also located in the facilities, as well as warm air hand dryers and tankless water heaters.

Wabash River Trail, Inc. is a not-for-profit organization focused on the creation of this trail, which will be primarily funded with private donations and grants. The vision is to have a long trail interconnecting nearby towns, to provide the area with easy opportunities to get outside, and to create a stronger bond between the community and the environment.

Don’t Just Take Our Word For It!

Thank you, Romtec team, the project came out wonderfully!

Department of Conservation and Natural Resources
Rating: 5

We were really impressed with the crew who came and constructed the pavilion, and the finished product is exactly as we envisioned. Thank you for helping us achieve this vision.

Fall River Valley
Rating: 5

Everyone is happy with the new restrooms. Thanks for all the hard work!

City of Irvine
Rating: 5

The end product is beautiful.

City of Reedley
Rating: 5

Thank you for everything and if/when there are jobs where we need something like this, Romtec will be at the top of the list!

Rock-N-Road Construction Inc
Rating: 5

We had an awesome experience with Romtec and were very pleased (especially) about the communication that was given to us. The project went by very smoothly and we are now off to our next adventures. The finished product was everything and more that was promised by Romtec.

Rock-N-Road Construction Inc
Rating: 5

We are very happy with how they are turning out. We have received positive feedback from the community.

City of Miamisburg Parks and Recreation
Rating: 5

That Memorial Park Project is one of our favorites too – it truly made a positive impact for our visitors, and we will continue to keep Romtec in mind as opportunities to collaborate come up!

San Mateo County
Rating: 5

I have to mention that aside from the products Romtec supplies and the workmanship of the subcontractors (Ken and crew), I’m also very impressed with your responsiveness to issues – you’re a far cry from the usual taillight warranty.

San Mateo County
Rating: 5

I am very happy with the product and the customer care. Thank you all for going the extra mile to make your products even better.

City of Rockaway Beach
Rating: 5

You get what you pay for. Romtec provided the most perfect, seamless, flawless project I could have imagined. I would use Romtec 100 times over and will not consider any other options moving forward. You were able to beat my original budget and expectations. Everyone involved was great from sales to construction management, to the construction team themselves.

City of Coos Bay
Rating: 5

I was actually out today looking at the baseball park and your building is absolutely awesome.  Our buddy and all star baseball families are going to love it!

Rockford Park District
Rating: 5

We were very impressed with Romtec on this project. The entire team was professional, forward thinking, wiling to collaborate and compromise, and the structure turned out beautiful. We definitely got what we paid for (and then some!).

Chico Area Recreation and Park District
Rating: 5

Ken Perry’s crew who installed it did a fantastic job, very organized and professional, and efficient install.

Poppy Holding, Inc.
Rating: 5

If I were to do this again, I would no doubt hire Romtec and its subcontractors to do the installation. Hindsight is always 20/20 and I learned a valuable lesson that I will hire Romtec’s certified installers to do the construction.

City of Spearfish
Rating: 5

I would be remiss if I didn’t mention Dan Keagy (Romtec’s assistant construction manager). He in my opinion went above and beyond to solve our problems and problems that were not necessarily his or Romtec’s to solve. He is a great guy and great resource for Romtec. Overall, the biggest thing to me was the service after the sale. Romtec didn’t just make the sale and move on, but they supported us through a very long and arduous construction process.

City of Spearfish
Rating: 5

Romtec was phenomenal when it came to service after the sale. They were available anytime there were questions. In addition, there were some issues with missing materials. Even though it was not Romtec’s fault for the missing materials, the were more than willing to send us the missing materials to get the project done. Romtec even sent out a representative to tour the site to give firsthand recommendations on how to proceed.

City of Spearfish
Rating: 5
Logo For Romtec

Tell Us About Your Project!

Lets get your project moving forward! Tell us about your project and our team will get to work on a personalized solution than meets your needs.

Back To Top