Skip to content

Central City Park – Fontana, CA

In the Central City Park project, Romtec worked with the City of Fontana for the design and supply of three matching buildings for Central City Park in Fontana, California.

Central City Park was opened to the public in May of 2021, and is a 14.5-acre, deluxe sports park that “will create recreational opportunities for thousands of young soccer and football players in the years to come”. The Park features two large synthetic turf fields designated for soccer and football, and an additional synthetic turf field designated for soccer only. In addition to the sports fields, the park also includes horseshoe pits, an ADA accessible playground, and a community garden. (Ingold, 2021)

With all these amenities, Central City Park is certain to be a popular area for the community. Romtec worked with the City of Fontana for the design and supply of three structures to be installed before the grand opening of the park, including a restroom and concession structure, a 30’x20’ storage facility, and an additional utility/storage building for the community garden.

Project Gallery

Matching Concession and Restroom Buildings

The restroom building includes multi-user Men’s and Women’s restrooms with the facilities for 5 guests, a mechanical space for access to plumbing, a storage room, and a concession stand with a 3 basin sink and concession door. The Park is expected to have a high amount of foot traffic, especially during events, so it was important to design a multi-functional facility that would be able to serve the guests during their visit into the park and provide guests with refreshments during sporting events on hot summer days.

To create a unified theme throughout the park, all three buildings feature a matching design. The structures are composed of a gray, split face block with a stone veneer wainscot. The door frames, doors, and vents set in the block are all powder-coated black to provide a clean and professional finish that is resistant to damage from weather or vandalism. In addition to the durable block and powder-coated components, the metal roofing on this structure is also resistant to damage from weather and is an attractive and friendly evergreen shade.

As one of the newest parks in Fontana, the Central City Park has been designed with a wide range of interests and needs in mind. With the addition of this park, the City of Fontana has invested heavily in the health and wellbeing of its community, and provided ample opportunities for residents to get outdoors, engage in sports, and connect with others.

Ingold, R. (2021). Deluxe new park for youth soccer and football competition opens in Fontana. Fontana Herald News. Retrieved 4 December 2021, from https://www.fontanaheraldnews.com/sports/deluxe-new-park-for-youth-soccer-and-football-competition-opens-in-fontana/article_3bb14a24-ae95-11eb-865c-4bb8e982fd41.html.

Don’t Just Take Our Word For It!

Thank you, Romtec team, the project came out wonderfully!

Department of Conservation and Natural Resources
Rating: 5

We were really impressed with the crew who came and constructed the pavilion, and the finished product is exactly as we envisioned. Thank you for helping us achieve this vision.

Fall River Valley
Rating: 5

Everyone is happy with the new restrooms. Thanks for all the hard work!

City of Irvine
Rating: 5

The end product is beautiful.

City of Reedley
Rating: 5

Thank you for everything and if/when there are jobs where we need something like this, Romtec will be at the top of the list!

Rock-N-Road Construction Inc
Rating: 5

We had an awesome experience with Romtec and were very pleased (especially) about the communication that was given to us. The project went by very smoothly and we are now off to our next adventures. The finished product was everything and more that was promised by Romtec.

Rock-N-Road Construction Inc
Rating: 5

We are very happy with how they are turning out. We have received positive feedback from the community.

City of Miamisburg Parks and Recreation
Rating: 5

That Memorial Park Project is one of our favorites too – it truly made a positive impact for our visitors, and we will continue to keep Romtec in mind as opportunities to collaborate come up!

San Mateo County
Rating: 5

I have to mention that aside from the products Romtec supplies and the workmanship of the subcontractors (Ken and crew), I’m also very impressed with your responsiveness to issues – you’re a far cry from the usual taillight warranty.

San Mateo County
Rating: 5

I am very happy with the product and the customer care. Thank you all for going the extra mile to make your products even better.

City of Rockaway Beach
Rating: 5

You get what you pay for. Romtec provided the most perfect, seamless, flawless project I could have imagined. I would use Romtec 100 times over and will not consider any other options moving forward. You were able to beat my original budget and expectations. Everyone involved was great from sales to construction management, to the construction team themselves.

City of Coos Bay
Rating: 5

I was actually out today looking at the baseball park and your building is absolutely awesome.  Our buddy and all star baseball families are going to love it!

Rockford Park District
Rating: 5

We were very impressed with Romtec on this project. The entire team was professional, forward thinking, wiling to collaborate and compromise, and the structure turned out beautiful. We definitely got what we paid for (and then some!).

Chico Area Recreation and Park District
Rating: 5

Ken Perry’s crew who installed it did a fantastic job, very organized and professional, and efficient install.

Poppy Holding, Inc.
Rating: 5

If I were to do this again, I would no doubt hire Romtec and its subcontractors to do the installation. Hindsight is always 20/20 and I learned a valuable lesson that I will hire Romtec’s certified installers to do the construction.

City of Spearfish
Rating: 5

I would be remiss if I didn’t mention Dan Keagy (Romtec’s assistant construction manager). He in my opinion went above and beyond to solve our problems and problems that were not necessarily his or Romtec’s to solve. He is a great guy and great resource for Romtec. Overall, the biggest thing to me was the service after the sale. Romtec didn’t just make the sale and move on, but they supported us through a very long and arduous construction process.

City of Spearfish
Rating: 5

Romtec was phenomenal when it came to service after the sale. They were available anytime there were questions. In addition, there were some issues with missing materials. Even though it was not Romtec’s fault for the missing materials, the were more than willing to send us the missing materials to get the project done. Romtec even sent out a representative to tour the site to give firsthand recommendations on how to proceed.

City of Spearfish
Rating: 5
Logo For Romtec

Tell Us About Your Project!

Lets get your project moving forward! Tell us about your project and our team will get to work on a personalized solution than meets your needs.

Back To Top