Skip to content

Restroom & Garage at Normandale Lake Park – Bloomington, MN

BloomingtonMinnesota is a city just 10 miles south of downtown Minneapolis that is located on the north bank of the Minnesota River.

Sitting in Hennepin County, this city has a population of 89,987 which makes it the fourth most populous city in the state. Just to the northeast a few miles is the confluence of the Mississippi River with the Minnesota River.

A variety of beautiful lakes traverse the city providing recreation activities including Bush Lake, Mt Normandale Lake, Lake Girard, Skriebakken Lake, Hyland Lake, and Long Meadow Lake.

Interstate 35W and 494 cut through this area along with U.S. Route 169 and Route 77. The Minneapolis-Saint Paul International Airport is just to the northeast of the city.

Bloomington is home to the Mall of America which is a giant four level mall with hundreds of stores, restaurants, a theme park (Nickelodeon Universe), along with a movie theater and Sea Life aquarium.

Other local attractions include a Great Wolf Lodge Water ParkHyland Hills Skiing AreaRichardson Nature CenterNord Myr ParkMarsh Lake ParkNormandale Lake ParkNormandale Lake BandshellDred Scott FieldEast Bush Lake Beach, and Hyland-Bush-Anderson Lakes Park Reserve.

Project Gallery

Normandale Restroom and garage

Normandale Lake Park is 181 acres encompassing the lake, boat launch, trails, canoeing, fishing, off-street parking, picnic shelter, and picnicking. The park is part of the Hyland-Bush-Anderson Lakes Park Reserve.

The City of Bloomington had a project at Mount Normandale Lake in Minnesota for a new restroom and park maintenance garage building.

The city wanted to have a CMU Block building and reached out to Romtec for additional services. They purchased directly through Sourcewell a cooperative purchasing agreement. They chose Romtec to provide the demolition for the existing buildings, site work, and installing the new building.

Romtec sales worked directly with the city and WSB Engineering to come up with the design of the building and on the proposal. We had worked with WSB on past projects.

Normandale Restroom and garage

Romtec coordinated with the owner to define the scope and product offering. The project is located at the south end of the Chalet Road parking lot on the west side of Normandale Lake Park.

The new building is 1,532 square foot that combines the new restrooms and a park maintenance garage to replace the existing separate restroom and maintenance garage buildings.

The new facility has two gender neutral, Americans with Disabilities Act-compliant restrooms and a utility room. Around 1,200 square feet of maintenance space, replacing the approximately 400 square foot existing garage. It also has office space, an eye wash station, additional storage, and parking.

The building features a metal roof, fiber cement lap siding over 8″ x 16″ CMU smooth face concrete block wall, stone veneer, two garage doors, timber truss roof extension, and windows.

Romtec had worked with the city’s parks department previously on the Old Cedar Avenue Bridge Trailhead pavilion and building project.

We were proud to provide turnkey services for the designsupply, and construction (demolition, site work, and installation) of this restroom and maintenance garage building at Normandale Lake Park for the City of Bloomington in Minnesota.

Don’t Just Take Our Word For It!

Thank you, Romtec team, the project came out wonderfully!

Department of Conservation and Natural Resources
Rating: 5

We were really impressed with the crew who came and constructed the pavilion, and the finished product is exactly as we envisioned. Thank you for helping us achieve this vision.

Fall River Valley
Rating: 5

Everyone is happy with the new restrooms. Thanks for all the hard work!

City of Irvine
Rating: 5

The end product is beautiful.

City of Reedley
Rating: 5

Thank you for everything and if/when there are jobs where we need something like this, Romtec will be at the top of the list!

Rock-N-Road Construction Inc
Rating: 5

We had an awesome experience with Romtec and were very pleased (especially) about the communication that was given to us. The project went by very smoothly and we are now off to our next adventures. The finished product was everything and more that was promised by Romtec.

Rock-N-Road Construction Inc
Rating: 5

We are very happy with how they are turning out. We have received positive feedback from the community.

City of Miamisburg Parks and Recreation
Rating: 5

That Memorial Park Project is one of our favorites too – it truly made a positive impact for our visitors, and we will continue to keep Romtec in mind as opportunities to collaborate come up!

San Mateo County
Rating: 5

I have to mention that aside from the products Romtec supplies and the workmanship of the subcontractors (Ken and crew), I’m also very impressed with your responsiveness to issues – you’re a far cry from the usual taillight warranty.

San Mateo County
Rating: 5

I am very happy with the product and the customer care. Thank you all for going the extra mile to make your products even better.

City of Rockaway Beach
Rating: 5

You get what you pay for. Romtec provided the most perfect, seamless, flawless project I could have imagined. I would use Romtec 100 times over and will not consider any other options moving forward. You were able to beat my original budget and expectations. Everyone involved was great from sales to construction management, to the construction team themselves.

City of Coos Bay
Rating: 5

I was actually out today looking at the baseball park and your building is absolutely awesome.  Our buddy and all star baseball families are going to love it!

Rockford Park District
Rating: 5

We were very impressed with Romtec on this project. The entire team was professional, forward thinking, wiling to collaborate and compromise, and the structure turned out beautiful. We definitely got what we paid for (and then some!).

Chico Area Recreation and Park District
Rating: 5

Ken Perry’s crew who installed it did a fantastic job, very organized and professional, and efficient install.

Poppy Holding, Inc.
Rating: 5

If I were to do this again, I would no doubt hire Romtec and its subcontractors to do the installation. Hindsight is always 20/20 and I learned a valuable lesson that I will hire Romtec’s certified installers to do the construction.

City of Spearfish
Rating: 5

I would be remiss if I didn’t mention Dan Keagy (Romtec’s assistant construction manager). He in my opinion went above and beyond to solve our problems and problems that were not necessarily his or Romtec’s to solve. He is a great guy and great resource for Romtec. Overall, the biggest thing to me was the service after the sale. Romtec didn’t just make the sale and move on, but they supported us through a very long and arduous construction process.

City of Spearfish
Rating: 5

Romtec was phenomenal when it came to service after the sale. They were available anytime there were questions. In addition, there were some issues with missing materials. Even though it was not Romtec’s fault for the missing materials, the were more than willing to send us the missing materials to get the project done. Romtec even sent out a representative to tour the site to give firsthand recommendations on how to proceed.

City of Spearfish
Rating: 5
Logo For Romtec

Tell Us About Your Project!

Lets get your project moving forward! Tell us about your project and our team will get to work on a personalized solution than meets your needs.

Back To Top