Medium Shower Buildings
Shower/Restroom buildings designed to be spacious and equipped with utility and maintenance rooms.
Model 2056
A great shower building that offers four, private-entry restroom and shower units. Two rooms are ADA-compliant restrooms and showers with ADA shower benches. The other two rooms have a smaller layout to reduce the building size and cost.
Model 2070
This Restroom and Shower Building layout has separated men’s and women’s restrooms and single-user shower rooms on the opposite side of the building. These rooms all meet ADA requirements for public facilities. This model also includes a central mechanical room that provides access to the building utilities and the water heater.
Model 2071
This Multi-User Restroom and Shower Building is designed with separated men’s and women’s restrooms with connected single-user showers and a central mechanical room. This model is perfect for frequent restroom traffic and occasional shower needs. The public restroom and shower rooms are designed to meet all ADA requirements for accessibility.
Model 2072
A Multi-User Restroom and Shower design that has a large central mechanical room for improved functionality. These ADA-compliant restrooms are separated into men’s and women’s and each contains two toilets and one sink. The two shower rooms are located at the opposite end from the restrooms and have private entrances to each.
Model 2073
A medium shower building that’s designed with a spacious mechanical room. The mechanical space can contain controls for a pool, splash pad, lighting, and other features available at any recreational facility. The mechanical room sits between the men’s and women’s two-stalled restrooms.
Model 2074
A Multi-User Restroom and Shower which includes two men’s and women’s multi-user bathrooms and two men’s and women’s multi-user shower rooms. In each shower room there is an ADA-compliant shower for accessibility. A mechanical room runs the length of the center of the building for access to the building utilities and water heaters
Model 2075
This Multi-User Restroom and Shower building is an affordable and attractive community structure for moderately-trafficked parks and recreational sites. These ADA-compliant women’s and men’s facilities each have two shower stalls and two restroom stalls and the structure has a central mechanical room for access to the utilities and water heater. The mechanical room is sized to keep the building cost down for this bathhouse floor plan.
Model 2076
A great bathhouse structure that provides ample public restrooms and showers in six private-entry rooms. Two rooms are sized to meet all ADA requirements while four other rooms are economically configured to reduce the building cost. Each room offers a sink, a toilet, and a separate shower space with a bench.
Model 2077
The Romtec Model 2077 – Sierra III Multi-User Restroom and Shower building combines the shower and restroom stalls into two large rooms for men’s and women’s facilities. At the center of the building is a large mechanical room that has been widened on this model to add more space for storage, for example, facility controls, security systems, large water heaters, and more.
Model 2088
The Romtec Model 2088 – Sierra IV Six-Pak is a great bathhouse structure that provides ample public restrooms and showers in six private-entry rooms. Two rooms are sized to meet all ADA requirements while four other rooms are economically configured to reduce the building cost. Each room offers a sink, a toilet, and a separate shower space with a bench.
Ready to Get Started?
Fill out our short and easy form and receive quote on any building.
We were really impressed with the crew who came and constructed the pavilion, and the finished product is exactly as we envisioned. Thank you for helping us achieve this vision.
Everyone is happy with the new restrooms. Thanks for all the hard work!
The end product is beautiful.
Thank you for everything and if/when there are jobs where we need something like this, Romtec will be at the top of the list!
We had an awesome experience with Romtec and were very pleased (especially) about the communication that was given to us. The project went by very smoothly and we are now off to our next adventures. The finished product was everything and more that was promised by Romtec.
We are very happy with how they are turning out. We have received positive feedback from the community.
That Memorial Park Project is one of our favorites too – it truly made a positive impact for our visitors, and we will continue to keep Romtec in mind as opportunities to collaborate come up!
I have to mention that aside from the products Romtec supplies and the workmanship of the subcontractors (Ken and crew), I’m also very impressed with your responsiveness to issues – you’re a far cry from the usual taillight warranty.
I am very happy with the product and the customer care. Thank you all for going the extra mile to make your products even better.
You get what you pay for. Romtec provided the most perfect, seamless, flawless project I could have imagined. I would use Romtec 100 times over and will not consider any other options moving forward. You were able to beat my original budget and expectations. Everyone involved was great from sales to construction management, to the construction team themselves.
I was actually out today looking at the baseball park and your building is absolutely awesome. Our buddy and all star baseball families are going to love it!
We were very impressed with Romtec on this project. The entire team was professional, forward thinking, wiling to collaborate and compromise, and the structure turned out beautiful. We definitely got what we paid for (and then some!).
Ken Perry’s crew who installed it did a fantastic job, very organized and professional, and efficient install.
If I were to do this again, I would no doubt hire Romtec and its subcontractors to do the installation. Hindsight is always 20/20 and I learned a valuable lesson that I will hire Romtec’s certified installers to do the construction.
I would be remiss if I didn’t mention Dan Keagy (Romtec’s assistant construction manager). He in my opinion went above and beyond to solve our problems and problems that were not necessarily his or Romtec’s to solve. He is a great guy and great resource for Romtec. Overall, the biggest thing to me was the service after the sale. Romtec didn’t just make the sale and move on, but they supported us through a very long and arduous construction process.
Romtec was phenomenal when it came to service after the sale. They were available anytime there were questions. In addition, there were some issues with missing materials. Even though it was not Romtec’s fault for the missing materials, the were more than willing to send us the missing materials to get the project done. Romtec even sent out a representative to tour the site to give firsthand recommendations on how to proceed.
Tell Us About Your Project!
Lets get your project moving forward! Tell us about your project and our team will get to work on a personalized solution than meets your needs.
"*" indicates required fields





