Skip to content

Echo Canyon Trailhead in Phoenix, AZ

Phoenix is one of the hottest places in the United States. Phoenix is the capital of Arizona and is part of a multi-city metropolitan area including GlendaleTempe, and Scottsdale called the Valley of the Sun.

The City of Phoenix has a population of 1,608,000 making it the fifth most populous city in the United States. The Phoenix metropolitan area has a population of 4.85 million.

Some popular attractions include the Desert Botanical GardenPhoenix Art Museum, the Phoenix ZooCamelback MountainPapago Park, and the Arizona Science Center.

The Echo Canyon Trail on Camelback Mountain is a very popular outdoor recreation spot for people in the Phoenix area, but the old trailhead was not capable of meeting the community’s needs and population increase that the Phoenix area has seen.

The City of Phoenix funded a renovation of the trail that included adding a restroompavilion, and gate house to the trailhead and making significant trail improvements.

Project Gallery

Curved Metal Roof with Green Accents

One aspect of the project was to reroute portions of the trail and to repair other sections. The project also included construction to more than double the available parking at the site and provide better facilities for hikers. A major portion of improving the facilities included adding three structures that were provided by Romtec.

The trailhead portion of the project required a new permanent restroom facility and a matching pavilion which created a common visual theme.

The parking lot renovation required a gatehouse building to monitor parking and enforce the park rules. The City of Phoenix had a clear design preference for these structures that included curved steel roofs and a brown desert color scheme that was matched on all three structures.

The privacy walls on the restroom building have steel posts and use corrugated steel for the paneling. This building also has two drinking fountains to provide more sources of drinking water to the hikers.

Curved Metal Roof with Lexan Windows

The pavilion matches the restroom with beige steel posts and corrugated steel roofing that is painted with a weathered copper color. The roof of the pavilion has a similar contour to the restroom and both structures sit side by side. The pavilion offers hikers shaded benches for cooling down and recuperating after hiking the Echo Canyon Trail at Camelback Mountain.

The gatehouse features a sliding window and counter that allows park employees to speak with visitors about parking availability and other park topics. Air conditioning is also included in this building to make it more comfortable for the staff.

The overall design aesthetic was provided by the City of Phoenix and Romtec delivered three buildings that serve various purposes, but all match the same desert color scheme that the city desired.

Romtec is proud to have been part of the renovations of the trails and trailhead at Echo Canyon Trail that leads up Camelback Mountain in Phoenix, Arizona. This project shows the capabilities of Romtec to design multiple buildings that match a specific aesthetic theme, while also providing a multi building project that included a restroom building, pavilion, and gatehouse.

Don’t Just Take Our Word For It!

Thank you, Romtec team, the project came out wonderfully!

Department of Conservation and Natural Resources
Rating: 5

We were really impressed with the crew who came and constructed the pavilion, and the finished product is exactly as we envisioned. Thank you for helping us achieve this vision.

Fall River Valley
Rating: 5

Everyone is happy with the new restrooms. Thanks for all the hard work!

City of Irvine
Rating: 5

The end product is beautiful.

City of Reedley
Rating: 5

Thank you for everything and if/when there are jobs where we need something like this, Romtec will be at the top of the list!

Rock-N-Road Construction Inc
Rating: 5

We had an awesome experience with Romtec and were very pleased (especially) about the communication that was given to us. The project went by very smoothly and we are now off to our next adventures. The finished product was everything and more that was promised by Romtec.

Rock-N-Road Construction Inc
Rating: 5

We are very happy with how they are turning out. We have received positive feedback from the community.

City of Miamisburg Parks and Recreation
Rating: 5

That Memorial Park Project is one of our favorites too – it truly made a positive impact for our visitors, and we will continue to keep Romtec in mind as opportunities to collaborate come up!

San Mateo County
Rating: 5

I have to mention that aside from the products Romtec supplies and the workmanship of the subcontractors (Ken and crew), I’m also very impressed with your responsiveness to issues – you’re a far cry from the usual taillight warranty.

San Mateo County
Rating: 5

I am very happy with the product and the customer care. Thank you all for going the extra mile to make your products even better.

City of Rockaway Beach
Rating: 5

You get what you pay for. Romtec provided the most perfect, seamless, flawless project I could have imagined. I would use Romtec 100 times over and will not consider any other options moving forward. You were able to beat my original budget and expectations. Everyone involved was great from sales to construction management, to the construction team themselves.

City of Coos Bay
Rating: 5

I was actually out today looking at the baseball park and your building is absolutely awesome.  Our buddy and all star baseball families are going to love it!

Rockford Park District
Rating: 5

We were very impressed with Romtec on this project. The entire team was professional, forward thinking, wiling to collaborate and compromise, and the structure turned out beautiful. We definitely got what we paid for (and then some!).

Chico Area Recreation and Park District
Rating: 5

Ken Perry’s crew who installed it did a fantastic job, very organized and professional, and efficient install.

Poppy Holding, Inc.
Rating: 5

If I were to do this again, I would no doubt hire Romtec and its subcontractors to do the installation. Hindsight is always 20/20 and I learned a valuable lesson that I will hire Romtec’s certified installers to do the construction.

City of Spearfish
Rating: 5

I would be remiss if I didn’t mention Dan Keagy (Romtec’s assistant construction manager). He in my opinion went above and beyond to solve our problems and problems that were not necessarily his or Romtec’s to solve. He is a great guy and great resource for Romtec. Overall, the biggest thing to me was the service after the sale. Romtec didn’t just make the sale and move on, but they supported us through a very long and arduous construction process.

City of Spearfish
Rating: 5

Romtec was phenomenal when it came to service after the sale. They were available anytime there were questions. In addition, there were some issues with missing materials. Even though it was not Romtec’s fault for the missing materials, the were more than willing to send us the missing materials to get the project done. Romtec even sent out a representative to tour the site to give firsthand recommendations on how to proceed.

City of Spearfish
Rating: 5
Logo For Romtec

Tell Us About Your Project!

Lets get your project moving forward! Tell us about your project and our team will get to work on a personalized solution than meets your needs.

Back To Top